MAQRO CONSTRUCTİON LLC

Customer: Branch of MAGRO CONSTRUCTION LLC in the Republic of Azerbaijan

Works performed: Installation and testing of a lightning arrester and grounding system in the area used by AzerGold CJSC in the territory of Dashkasan region ЧФЕС.

Installation of lightning rod (with arrester) and grounding system in the dormitory area.

  • lightning rod - 18m
  • paranator - DE-LUXO ESE
  • copper rod-4 pieces, 20mm in diameter, 2m long
  • copper wire - 10mm in diameter, 49m long
  • lightning arrester - 1 pc
  • grounding resistance - 2.5 Ohm

2. Installation of a lightning rod (together with a conductor) and grounding system on the roof of the machine and mechanism repair shop.

  • lightning rod - 16.7 m
  • paranator - DE-LUXS060- AE 10205, serial no: 2100264, radius - 107m
  • copper rod-4 pieces, 20mm in diameter, 2m long
  • Cable - LICON AE 21182
  • copper wire - 10mm in diameter, 10m long
  • lightning arrester - 1 pc
  • grounding resistance - 1.3 Ohm